NV20 Preliminary Installation

January 1, 2009

On 12/30, I finished the preliminary installation of 2 NV20s from Nautel. I plumbed the RF line into the switches and the electrician wired up the panels. One disconnect had to be upgraded to accommodate one of the new transmitters.
I successfully turned both on within 4 hours of each other without modulation. Both came up as expected and it is quite amazing what can be monitored and controlled via the front touch screen. As our IT guy said, we have two 20kW Linux computers!
Next is to finish the air chain and wire the audio into the systems. Nautel has a planned software upgrade for our boxes. This is to be expected as we have the first production runs installed in the real world. I am quite interested to see how they perform.